Home / Projects Docs / Yangjie Electronics
CASE 04 Industrial / primary pump network

Yangjie Electronics plant, Yangzhou

Electronics plant · primary pump network · chiller plant AI control
Location
Yangzhou, Jiangsu
Scenario
Electronics plant chiller room
System
Plant · primary pump network
Scope
BAS integration / AI engine / managed operation
Constraint
Process stability first
> 4.7Average plant EERPlant EER
20%Energy savingVerified saving
7×24Remote + on-site operationOperation

Context and challenge

Electronics plants need tight temperature, humidity and cooling reliability, so operators tend to run one more machine than necessary and keep generous margins. The existing BAS systems were isolated, data was scattered and the saving potential was invisible.

The hard constraint: no strategy may compromise the process environment.

What we did

  • Integrate the existing BAS: controllers kept in place, plant equipment connected to one platform for full monitoring.
  • Add the AI engine: a strategy layer above existing control, optimising staging and frequency against load and outdoor conditions.
  • Safety boundaries: hard limits on critical parameters and automatic fallback to the original control logic.
  • Managed operation: remote monitoring plus on-site inspection, with strategies following the production schedule.

Result

Average plant EER is above 4.7 and the plant saves 20% of its energy while still meeting process conditions. Operation moved from experience-driven to data-driven.

Project note

Industrial clients care less about the saving number than about whether production is affected. Rollback, hard constraints and explainable strategies are what make this class of project deliverable.

02 Scope / DELIVERY

Make the plant controllable first

StageApproachPurpose
IntegrateExisting BAS consolidated into one data modelSee how the plant actually runs
ConstrainHard limits + one-click rollbackProtect the process environment
OptimiseStaging and frequency combinationPlant EER > 4.7
OperateRemote monitoring + site inspectionSustain the 20% saving

Industrial savings vary with production load; segment verification by shift and season.

Comparable systems,
different results

We keep the full test record and strategy log for this project. If your plant looks similar, start with a measured audit before committing to a retrofit.