Home / Projects Docs / Zhaoxiang
CASE 03 Campus / primary pump network

Zhaoxiang Yangtze River Delta Tech Park

250,000 m² · primary pump network · campus plant
Location
Shanghai · Qingpu, Zhaoxiang
Floor area
250,000 m²
Function
Offices / R&D / F&B
System
Plant · primary pump network
Scope
Platform integration / metering / expert O&M
28%Energy savingVerified saving
> 5.0Plant system EERPlant EER
250,000 m²Served floor areaFloor area

Context and challenge

The campus comprises several buildings with siloed subsystems, limited metering and reporting, and O&M that depended on manual rounds. Efficiency problems were found late and fixed slowly. The operator needed visibility and control before rebuilding anything.

What we did

  • One platform: plant and building subsystems integrated so data is collected and displayed in one place.
  • Data first: metering and acquisition completed to establish an energy baseline and rank the saving potential.
  • Strategy optimisation: AI strategies layered on that data, with the plant optimised against real-time load.
  • Expert O&M: SaaS monitoring with remote expert tuning; issues are found online and handled on site.

Result

Plant system EER now holds above 5.0 and the campus achieves a 28% energy saving. The combined online and on-site operating model moved maintenance from reactive repair to proactive detection.

Project note

For a campus the value is not only the saving rate: putting several buildings and subsystems onto one data model creates the basis for carbon reporting and future equipment decisions.

02 Scope / DELIVERY

Connect the data, then optimise

PhaseDeliverableOutcome
DiagnosisSurvey, metering completion, energy baselineBaseline report
IntegrationPlant and subsystems onto one platformCampus energy platform
OptimisationAI strategies and parameter tuningPlant EER > 5.0
OperationSaaS monitoring + expert tuning28% saving (statistical)

Campus savings depend on occupancy, trading hours and weather; annual re-verification is recommended.